Scan It LabsPW Scan IT BV
Dynamics 365 Finance & Operations · read-only tools

Fewer screens, faster answers.

Browser extensions that answer the questions D365 supply chain teams ask every day. Open an order and see why it is stuck. Nothing is written to D365, and nothing leaves your browser.

SO-104219 · USMFRead-only
  1. Ordered
  2. Confirmed
  3. Reserved
  4. Released
  5. Picked
  6. Packed
  7. Shipped
  8. Delivered
  9. Invoiced
  10. Paid
Why stuck? Line 1: ready. Fully reserved in WH-11 and the pick location holds enough stock. Nothing on this line blocks it; it waits only for the order’s credit hold to clear.
Why stuck? Line 2: expiring batch. Reserved on batch B-0912, which expires on 2 Nov, three days before the requested delivery on 5 Nov. Re-reserve a later batch before the order is released.
Why stuck? Line 3: short. Only 5 of 8 reserved. The rest comes on PO-00381, due 24 Oct, three days after the confirmed ship date. Expedite the purchase or split the delivery.
Order: customer on credit hold, €48,210 open, limit €40,000. Release to warehouse is blocked until credit management clears it.
36 checks · 3 lines · select a line2 blockers
PO-00381 · Hydrotec GmbHRead-only
  1. Ordered
  2. Approved
  3. Confirmed
  4. Received
  5. Invoiced
  6. Paid
Why stuck? Line 1: late. The vendor confirmed 27 Oct instead of the requested 24 Oct. Two orders wait for this receipt: SO-104219 (3 pcs) and PRD-008812 (4 pcs).
Why stuck? Line 2: invoice missing. Received in full on 9 Oct, but no vendor invoice is registered after 4 days. The product receipt is not yet matched.
Why stuck? Line 3: done. Received and invoiced; the invoice matched the purchase price within tolerance.
Order: approved on 2 Oct. Vendor response: confirmed with changes, delivery date moved by three days.
24 checks · 3 lines · select a line1 blocker
PRD-008812 · Pump assembly P-200Read-only
  1. Created
  2. Estimated
  3. Scheduled
  4. Released
  5. Started
  6. Finished
  7. Ended
Why stuck? Material: short. The picking list can’t be posted: all actuators on hand are reserved for SO-104219. The next receipt is PO-00381 on 27 Oct, after the scheduled start.
Why stuck? Operation 20: capacity. Resource group WELD is loaded at 112% in week 43, so operation 20 is scheduled after the order’s delivery date.
Why stuck? Material: ready. Reserved from batch H-2210; its quality order has passed.
Order: the BOM changed after the order was estimated (H1000 added), so the estimated cost is out of date.
34 checks · 3 lines · select a line1 blocker
TO-00977 · WH-11 → WH-30Read-only
  1. Created
  2. Released
  3. Picked
  4. Shipped
  5. In transit
  6. Received
Why stuck? Line 1: in transit too long. Shipped 6 days ago; the usual lead time from WH-11 to WH-30 is 2 days. No receipt is registered at WH-30.
Why stuck? Line 2: short shipped. 45 of 50 shipped. The remaining 5 are still open on a load that has already been confirmed.
Why stuck? Line 3: done. Shipped and received in full.
Order: load LD-04415 was confirmed as shipped on 7 Oct; WH-30 has not started receiving work for it.
21 checks · 3 lines · select a line1 blocker
RMA-00231 · Delta Pumps NVRead-only
  1. Created
  2. Arrived
  3. Disposition
  4. Credited
  5. Closed
Why stuck? Line 1: no disposition. Arrived on 4 Oct, but after 8 days there is still no disposition code, so no credit note can be created.
Why stuck? Line 2: replacement waiting. Replacement order SO-104511 was created on 5 Oct and has not shipped yet.
Why stuck? Line 3: done. Scrapped on arrival and credited to the customer.
Order: the customer is still waiting for a credit of €2,340 on this return.
15 checks · 3 lines · select a line1 blocker
Read-only browser toolsNo D365 data leaves your browserEdge and Chrome · 5-day trial, no card
Seen in D365Real screenshots · fictional Contoso data
Supply Chain X-ray · the side panel on a sales order
Inventory Hover · Alt over an item number
CMR consignment note · filled from the load, ready to print
The tools

Every tool, one rule.

Each one does a single job for one kind of D365 user, and none of them can change your data. They read what your security roles already let you read.

Supply Chain X-ray

Paid

Why is this order stuck? Sales, purchase, production, transfer and return orders in one side panel, plus a Workspace of 18 reports.

For order desk, planners, buyers

Inventory Hover

Free

How much is in stock, and where? Hold Alt over any item number for stock per warehouse and the product fields you choose.

For anyone in D365

Config Diff

On request

Where is the setup different? Compare legal entities, UAT and PROD, or today against a snapshot, across 345 configuration areas.

For consultants, release managers

Security X-ray

Free panel Paid workspace

Who has access, and which licence do they need? The role that makes a user expensive, segregation of duties, and the right role for a job.

For security admins, IT, finance

CMR consignment note

On request

The CMR for this load? One click on an outbound load fills the IRU-model form in up to four languages, with a register of every print.

For shipping and logistics
Coming soon

More tools, same licence.

One licence unlocks every paid tool, including the ones still to come. Tell us the question your team asks most.

Suggest a tool →
Pricing

One licence, every paid tool.

Each extension starts with a 5-day trial, no card. One key then unlocks all of them, and the ones still to come. Invoices and VAT handled by Stripe.

Per user
€15per month
or €149 per year, excl. VAT Start a 5-day trial
Team · up to 25 users
€249per month
one D365 environment, or €2,490 per year See pricing
Consulting

Tools from the project floor.

The same people implement D365 F&O supply chain and warehouse projects, per hour or per day. The tools exist because these questions came up on every one of them.

Implementation

D365 F&O implementations, start to go-live.

Hands-on support on your implementation project at an hourly or daily rate: supply chain process design, configuration, testing, data and go-live, with a focus on warehouse management.

Health check

Get more out of the D365 you already run.

For companies already live on D365 F&O: a review of how the system is used, where processes work around it, and concrete advice to use it better. Above all as a Warehouse health check.

ERP selection

Choosing an ERP? See what D365 F&O really does.

For companies in the selection phase: an independent explanation of how D365 F&O handles your supply chain processes, what fits as standard and what would need extra work.

Custom extensions

A browser extension built for your process.

A read-only browser extension made for your own D365 process, or one of our extensions adapted to it: your own fields, checks, overviews or print forms, such as a CMR with your carriers’ wording. Built by the same rules as our products: nothing is written to D365 and nothing leaves the browser. Quoted per project.

How the tools are built

Built the way your IT department would ask for.

01 · Read-only

Nothing is ever written to D365.

The extensions only send read requests (HTTP GET) to D365. There is no button that can post, change or delete, and in Config Diff and Security X-ray a check in the build fails if any code tries.

02 · In your browser

Your session, your roles, your machine.

Orders, items and configuration are read through your own signed-in D365 session and processed in the browser. They are never sent to us or anyone else.

03 · Minimal

Few permissions, no telemetry.

D365 sites only, no tracking, no analytics. A paid licence check sends an email address, a key and the environment name, and nothing more. Permissions and managed deployment for IT.

Start with a conversation.

A project that needs D365 supply chain experience, or a question one of the tools could answer for your team. One email is enough to start.